Friday, 13 April 2018

13.4.18 Shed slab done and kitchen bench in

Our shed slab has been poured! There are 3 parts to it: the main enclosed triple bay shed, the wash bay/stable area at the rear for the horses and the water tank slab on the side. Very happy with the size of it and the shed builder will be here next week to put it up! Our caesarstone bench tops are also in, which look fantastic! I have been taking sneaky pictures through the windows, as we are still very much locked out.